Sunday, September 19, 2010

Holy situation.




Floor, floor, floor, every time we work we are repairing bad floors.

The leaking bathroom upstairs caused by the bad support of the floor joist created a cancer that's affected the floors on both levels. I knew that we would be replacing flooring but I had no idea how much.

The good news is that we have gotten pretty good at tearing out bad flooring. One more spot in the living room and we should have all the cancer removed.

More good news, I got $299 for all the scrap copper pipes that will go a long way towards paying for the new piping.

Today (besides fixing floors) we put up the new walls for the half bath on the first floor including a sweet wet wall. Finally turning the corner from demo to new construction.

Saturday, September 11, 2010

Finaly New Wood

Finally after doing nothing but tearing out stuff we finally got some building done.

We setup a temporary support wall to hold up the second floor and then removed what was left of the old load-bearing wall. Then we secured our new 2x10 beam on the good side by the stairway and used a bottle jack to lift the beam in the middle.

When the beam was level we had brought up the bad side of the second floor almost an inch and made it level with the other part of the wall.

Those beams were so poorly supported I'm surprised the second floor hadn't come crashing down. But now we have nice solid support and the space is opened up nicely just like we wanted.

Speaking of the second floor, we got the sub floor fixed and can walk upstairs again without worrying about falling through a big hole.

We also tore out all of the old DWV and water supply pipes. Had a bit of a nasty surprise (besides Tim's shower in old sewage) the main stack took an unexpected turn and that will complicated my design for the master bath. Just some of the fun of renovation.

Monday, September 6, 2010

Sunday, September 5, 2010

Lemons into lemonade

So I was all excite to start finally building something instead of just doing demolition. The plan was to build a temporary supporting wall and then install the new header that will hold up the second floor. Then we can start on floor repairs.

Tim met me over at Lowe's and we picked up some 2x4's and 2x10's and headed over to the townhouse. I open the front door and I don't hear the alarm chirping. I soon discovered that we had no electricity. I call Casey and find out that he hasn't paid the electric bill in a couple months. Lovely, all my plans shot too hell, a three day weekend wasted. I was so pissed!

But then my mind started thinking, hmmm IPL has shut off the power to the house. I can now change out the breaker box!

The breaker box was always going to be a problem. It's an old fuse type box that's too small and too messed up. I have the skills to replace it but the electric company kind of frowns on DIY'ers doing that kind of project. To come out and disconnect and then reconnect the power they require a licensed electritian to come out and at least inspect the job. This was going to cost me.

But now the power is turned off and I can replace the box and then have it reconnected in my name and nobody will know the box has been changed (unless they read this blog.)

You ask for miracles, Theo.... I give you the IPL

Wednesday, September 1, 2010

Sometimes My Mind Wanders

This summary is not available. Please click here to view the post.